Home / Areas we cover / Newport
Land and housing development in Newport
Housing schemes in Newport planned around soft Levels ground, the tidal River Usk and Welsh drainage approval.
Developing land in Newport
Newport is around 40 minutes from our base in Mountain Ash, and we take on land here for landowners, housing associations, the city council and investors. The aim is the same on every site: a plot turned into finished homes, with one team answerable for the ground beneath them.
We do not yet have a Newport project to point to. We do have an in-house groundworks team with more than 50 years combined experience across drainage, foundations, retaining structures, reinforced concrete and site infrastructure. In a city of soft ground and tidal water, that is where a housing scheme tends to be won or lost.
Soft ground, a tidal river and the Levels: building homes in Newport
Newport has some of the most distinctive ground in South Wales. South of the city, the Gwent Levels are low-lying alluvial land, protected by sea walls and drained by a network of ditches known locally as reens. Eight Sites of Special Scientific Interest cover parts of the Levels, including Nash and Goldcliff, and Redwick and Llandevenny, so land near them brings both soft ground and environmental limits.
Soft alluvium changes how a house is supported. Where firm ground lies deep, the foundation design has to follow what a proper ground investigation finds, rather than assuming a standard footing will do, and that can decide whether a scheme stacks up. We build foundations and reinforced concrete ourselves, so we can price the answer instead of guessing at it.
Then there is the Usk, which has the second highest tidal range in the world. Natural Resources Wales has completed a flood scheme protecting more than 660 homes around Crindau, and a £21 million scheme at Liswerry was designed to reduce the risk to 2,000 properties. Under TAN 15, in force since March 2025, the Flood Map for Planning sets how a site near the river or the Levels is treated, and it is the first thing we check.
Up the hill, Bettws, Malpas and Rogerstone sit on higher, sloping ground where levels and retaining walls tend to matter more than flood water. Wherever the plot is, Newport City Council acts as the SuDS Approval Body, and new sewers joining the public network need a Section 104 agreement with Dŵr Cymru Welsh Water. Both go into the layout from day one, not after planning is granted.
From the first site walk to the keys
- 1Get in touch and walk the site
- 2Prove the ground
- 3Get it out of the ground
- 4Build
- 5Hand over
Questions about Newport
No. It is around 40 minutes by road, and we take on Newport land for landowners, housing associations, councils and investors. We have not completed a project in the city yet, so ask us about Heol Fawr in Nelson and our retaining work in Blaenau Gwent.
Soft alluvial ground does not rule a site out, but it changes the foundations. A ground investigation shows how deep firm ground is, and the foundation design follows from that. Parts of the Levels are also protected as Sites of Special Scientific Interest, which can limit what is possible.
TAN 15, in force in Wales since 31 March 2025, uses the Natural Resources Wales Flood Map for Planning to guide how development in areas at risk of flooding is assessed. We check a Newport site against the map before any layout is drawn.
Get in touch
Got land, or a scheme that needs delivering? Tell us about the site and we will arrange a call, then meet you there to walk it together.
“C&M Jones has consistently demonstrated professionalism, reliability, and a diligent approach to all aspects of their work.”
CHAS accredited · Approved Platipus installer
Your details go to C&M Developments only. We never pass them on.